Skip to content

MinersHub

Bitcoin Mining Hosting

BITCOIN MINING HOSTING · UAE + OMAN · FROM $0.067/kWh

Bitcoin mining hosting is colocation for SHA-256 ASIC miners. You keep the machines and the block rewards; Miners Hub supplies industrial power, cooling, rack or tank space, network, 24/7 monitoring and on-site repair, billed as an all-in rate per kWh consumed. We host Bitcoin fleets across 21 farms in the UAE and Oman, 50 MW of active load, from $0.067/kWh, with up to 4.5 MW of UAE capacity free today.

Bitcoin miners are a power problem with a heat problem attached

A Bitcoin fleet is not a server rack. A single current-generation SHA-256 machine pulls between 3.5 kW and 11 kW continuously and converts effectively all of it into heat. Thirty of them is a small industrial load. Three hundred is a substation conversation. In GCC ambient conditions the heat side decides whether the fleet runs at rated hashrate or throttles through the afternoon, which is why our floor is built around hydro and immersion rather than air alone.

  • 50 MWactive load
  • 21 farmsUAE and Oman
  • 10,000+ASICs deployed
  • 4.5 MWUAE capacity free now

What hosting a Bitcoin miner actually costs

Short version: multiply the machine’s power draw in kW by 24, then by $0.067. That is the daily energy line. Everything else in the all-in rate (transformers, security, monitoring, repair float, customs handling) is already inside that number.

Below are real figures for units we currently supply and host, calculated at the published entry rate. The rate falls as deployment size grows, so treat these as ceilings rather than quotes.

Machine Hashrate Efficiency Cooling Energy per day Per 30 days
Antminer S23 Hyd 580T 580 TH/s 9.5 J/TH hydro $8.86 $266
SealMiner A3 Pro Hyd 660T 660 TH/s 12.5 J/TH hydro $13.27 $398
WhatsMiner M74S 300T 300 TH/s 13.5 J/TH air $6.51 $195
Antminer S21 XP 270T 270 TH/s 13.5 J/TH air $5.86 $176
WhatsMiner M70S 246-252T 246-252 TH/s 13.5 J/TH air $5.47 $164
Antminer S21e Hyd 310T 310 TH/s 14.5 J/TH hydro $7.23 $217
WhatsMiner M63S+ 398-416T 398-416 TH/s 17 J/TH hydro $11.37 $341
Antminer S21++ 235T 235 TH/s 16.5 J/TH air $6.23 $187

Efficiency is what compounds. At the same $0.067/kWh, a 9.5 J/TH machine buys roughly twice the hashrate per dollar of energy as an 18 J/TH machine. Over a two year contract that gap is larger than any rate negotiation you will win on the hosting side, which is why we push fleet selection before we push tiers.

Which tier your Bitcoin fleet lands in

Three operating tiers, assigned by how your machines are cooled and how much power the deployment draws.

Tier Power Cooling SLA Setup Minimum Live in
Tier 01 Air 50 to 500 kW Air 97% $50 per miner None 10 days
Tier 02 Hydro and Immersion 500 kW to 1 MW Hydro, single and dual phase immersion 98% From $600 per slot 4 units hydro, 2 units immersion 4 to 12 weeks
Tier 03 CAPEX and OPEX Large Scale 1 to 3 MW Mixed 98% Quoted Quoted Quoted

Air-cooled fleets deploy fastest because nothing has to be built. Hydro and immersion take 4 to 12 weeks because the cooling loop or tank is provisioned per fleet: manifolds, dielectric fluid, heat rejection, all specified against your SKU mix and density. If your live date is fixed, tell us at discovery and we will tell you honestly which tiers can hit it.

What one percent of uptime is worth

Uptime is the number operators check last and regret first. The arithmetic is simple: a fleet that runs 97% of the year loses about 11 days of production, and at 98% it loses about 7. Those four days are the entire difference between an air deployment and a liquid one over twelve months, before you count the hashboard life you buy back by keeping junction temperatures down.

Our Tier 01 air hosting targets 97% fleet level uptime. Tier 02 and Tier 03 target 98%. Remedy terms are written into the colocation contract rather than left as a marketing number.

What is included in the rate

  • Industrial power at the all-in $/kWh, transformers and distribution included
  • Cooling appropriate to the tier: air, hydro loop, or single and dual phase immersion
  • 24/7 monitoring of hashrate, temperature and per-machine status
  • On-site repair with a 1 to 5 day turnaround, backed by our ASIC repair bench in Al Ain
  • Import and customs clearance into the UAE under our own broker code
  • Physical security: access control, surveillance, insured facilities

Getting a fleet into the UAE

Most operators arrive with one of two problems: machines they already own sitting in the wrong jurisdiction, or capital allocated and no machines yet. We handle both. Existing fleets ship to us and we clear them; new fleets are sourced through our multi-vendor supply covering Antminer, WhatsMiner, SealMiner, IceRiver, ElphaPex, Fluminer, VolcMiner and Pinecone, then go straight from clearance to the floor with no second shipment. Browse what is available in the ASIC shop or read the UAE buying guide.

Questions operators ask

What is bitcoin mining hosting?
Bitcoin mining hosting, also called ASIC colocation or miner hosting, means your SHA-256 machines run inside an operator’s facility rather than your own premises. You keep ownership of the hardware and all mining rewards. The host provides industrial power, cooling, rack or tank space, network, monitoring and repair, charged as an all-in rate per kWh consumed.
How much does it cost to host a Bitcoin miner?
Miners Hub hosting starts at $0.067 per kWh. A 3.4 kW machine costs about $5.47 per day in energy, a 5.5 kW hydro machine about $8.86 per day. Setup is $50 per miner on air with no minimum order, or from $600 per slot on hydro and immersion. The per kWh rate falls as deployment size grows.
Do I keep the Bitcoin my machines mine?
Yes. You own the hardware, you point it at your own pool and wallet, and you receive 100% of the rewards. Miners Hub is paid for power, cooling and operations, never in a share of your production.
Can I host a single Bitcoin miner?
Yes, on Tier 01 air hosting there is no minimum order. Hydro hosting starts at 4 units and immersion at 2 units, because both need a cooling loop or tank provisioned for the fleet.
How fast can my fleet be earning?
Air cooled fleets are live within 10 days of greenlight once the hardware is on site. Hydro and immersion take 4 to 12 weeks because the cooling infrastructure is built per fleet. Customs clearance for imported machines runs in parallel and is handled by us.
Where are the facilities?
Twenty one operating farms across the UAE and Oman, 50 MW of active load. Dubai intake runs through our office at Schon Business Park in Dubai Investment Park; the repair bench is in Al Ain, Abu Dhabi. Oman sites cover Muscat, Sohar, Duqm and Salalah on the same SLA and pricing.
Free discovery call. Bring fleet size, machine models, target live date and current hosting situation. We will tell you which tier fits and what it costs before any contract, and we will say so if we are not the right fit.

Related

Request a hosting proposal   WhatsApp operations

21 FARMS · 50 MW · SUB-10 J/TH

Talk to operations.

30-minute discovery, no contract. Bring fleet size, target hashrate, timeline.