Choosing a mining host comes down to eight questions: what the all-in rate actually includes, who owns the floor, how the site is cooled, what the uptime number means contractually, how repairs are handled, what the contract does if power price moves, how fast you can leave, and whether the operator will show you the site. This guide is written by an operator, so read it as informed and interested rather than neutral.
1. What is inside the all-in rate
Two hosts can quote the same $/kWh and mean very different things. Ask explicitly which of these are inside the number: transformers and electrical distribution, security, monitoring, repair labour, spare part float, customs handling, network, and rack or tank space. Ask what is billed separately, and ask for one worked example bill for a fleet the size of yours.
Our published entry rate is $0.067/kWh and it includes power, cooling, 24/7 monitoring, on-site repair, and customs handling. Setup is separate and stated up front: $50 per miner on air, from $600 per slot on hydro and immersion.
2. Do they own the floor
Many hosting offers are resold capacity in someone else’s building. That is not disqualifying, but it changes who answers at 3am and how fast a hardware problem gets hands on it. Ask directly: do you own or lease this facility, and who employs the technicians on site. If the answer involves a third party, ask what the SLA between them looks like, because yours cannot be stronger than theirs.
3. How the site is cooled, and what happens in August
In the GCC this is the question that separates real capacity from spreadsheet capacity. Air cooled rooms lose headroom as ambient climbs, and machines protect themselves by throttling. Ask what fleet-level hashrate the site held through the hottest month of last year, not what it holds in January.
Hydro and immersion exist to make that question boring. A sealed water loop on cold plates, or hashboards submerged in dielectric fluid, both hold rated hashrate through summer and extend hashboard life by keeping junction temperatures down. If a host offers air only, that is a fine answer for an efficient fleet on a short hold; it is a poor answer for a hydro machine you just bought.
4. What the uptime number means in the contract
Uptime figures are marketing until they appear in a contract with a remedy attached. Ask three things: is the figure measured per machine or fleet-level, what window is it averaged over, and what happens when it is missed. A 99.9% number with no remedy is worth less than a 97% number with a written credit.
For scale: 97% over a year is about 11 days of lost production. 98% is about 7. That difference is usually the whole argument between an air deployment and a liquid one. Our tiers target 97% on air and 98% on hydro, immersion and large scale, with remedy terms written into the colocation contract.
5. How repairs actually work
Machines fail. The question is what the failure costs you in downtime. Ask where the repair bench is, whether technicians are in-house or subcontracted, what the turnaround is for a hashboard, and whether the host keeps a spare float so your slot keeps earning while your unit is on the bench.
Ours is in Al Ain, staffed in-house, 24 hour diagnostic with a fixed cost estimate and a 1 to 5 day turnaround. Fleets in Oman ride a weekly route to the same bench.
6. What happens when power prices move
A two year contract at a fixed rate is a bet by both sides. Ask whether the rate is fixed, indexed, or subject to pass-through, and if it is pass-through, ask to see the mechanism and the index in writing. A host who cannot explain their own tariff exposure will discover it at your expense.
7. How fast you can leave
Exit terms tell you how confident a host is. Ask about notice period, any de-racking or handling fee, and how long it takes physically to get your machines back in your possession. A host that makes leaving expensive is pricing in the fact that you might want to.
8. Will they show you the site
The simplest filter. An operator with real capacity will arrange a visit or a live walkthrough. If every request for a site visit turns into a rendering and a capacity claim, treat the capacity claim as unverified.
Red flags worth naming
- A rate quoted without stating what is included, then revised after you send fleet details
- Uptime figures that do not appear anywhere in the draft contract
- No named entity, no licence number, no physical address you can visit
- Pressure to sign before a site visit or a written proposal
- A host asking for a share of your mining rewards rather than charging for power and operations
- Vague answers about who clears customs and who is liable if hardware is held at the border
A short due diligence list
- Written proposal with all-in $/kWh, setup, and everything excluded stated explicitly
- Named legal entity and licence, with an address that matches
- Cooling type per tier, and last summer’s fleet-level performance
- SLA figure with measurement method and written remedy
- Repair location, staffing model, turnaround time, spare float policy
- Rate mechanism: fixed, indexed or pass-through
- Notice period and exit handling costs
- Site visit or live walkthrough completed
Questions
What should I look for in a crypto mining hosting service?
Is the cheapest hosting rate the best deal?
Should I host on air or liquid cooling?
What contract length is normal?
Do hosts take a share of mining rewards?
Related
- Our tiers, rates and minimums: crypto mining hosting
- Bitcoin specific economics: Bitcoin mining hosting
- Buying the hardware first: buy ASIC miners in the UAE
- Where we operate: Dubai, Abu Dhabi, Oman
Request Proposal