Skip to content
Hosting — Miners Hub

Hosting

Hosting

UAE + OMAN · 21 FARMS · UP TO 98% UPTIME

Hosting that survives heat air-only sites can’t.

Mining hosting in the GCC is a thermal problem first and a power problem second. Air-cooled rooms cap out around 100 J/TH ASIC efficiency in 50°C ambient. Today’s commercial fleet runs sub-15 J/TH on hydro and immersion — and the front line runs sub-10 J/TH on factory-immersion SKUs. We host on the cooling tier the hardware actually needs. Turnkey crypto mining solutions — hardware procurement, customs clearance, power, cooling, deployment, monitoring, and repair — under one operating plan.

0Active power
0Operating farms
0Hosting tiers
0Top-tier uptime

Hosting plans

PRICING · STARTING FROM $0.067/kWh · GLOBAL ASIC SUPPORT

Three operating profiles — pick the one that matches your fleet’s cooling. Pricing scales with deployment size; setup and minimum-order details listed per plan. All plans include 24/7 monitoring, on-site repair, and 1–5 day repair turnaround.

PLAN 01

Air cooling hosting

For air-cooled ASIC fleets — entry tier, lowest setup, broadest hardware compatibility.

From $0.067 /kWh Rate goes down with scale
Setup fee
$50 per miner (one-time)
Minimum order
No minimum
Compatible with
All air-cooled ASIC miners
Deployment
Within 10 days from greenlight
Inquire on WhatsApp
PLAN 02

Hydro cooling hosting

For hydro-cooled ASIC fleets — designed for GCC ambient, lower thermal stress, longer hardware life.

From $0.067 /kWh Rate goes down with scale
Setup fee
From $600 per slot
Minimum order
4 units
Compatible with
All hydro-cooled ASIC miners
Deployment
4–12 weeks (custom infrastructure build)
Infrastructure
Custom hydro cooling system — from $750/miner, 6-unit minimum
  • Reduced thermal stress, improved miner stability
  • Closed-loop coolant + manifold + quick-disconnect couplings, installation & commissioning included
Inquire on WhatsApp
PLAN 03

Immersion cooling hosting

Single-phase and dual-phase dielectric immersion — for immersion-native SKUs and air-cooled retrofits. 98% uptime SLA.

From $0.067 /kWh Rate goes down with scale
Setup fee
From $600 per slot
Minimum order
2 units
Compatible with
Immersion-native and air-cooled ASIC miners
Deployment
4–12 weeks (custom tank build)
Uptime SLA
98%
Infrastructure
Custom immersion tanks — from $800/slot, 6-unit minimum
  • Reduced thermal stress, improved miner stability
  • Dielectric fluid + heat-exchange design, installation & commissioning included
Inquire on WhatsApp

All plans include

  • 24/7 customer support
  • Real-time monitoring (hashrate, performance, temperatures)
  • On-site repair & maintenance
  • Repair turnaround 1–5 days (scope-dependent)

Operating tier breakdown below. The three plans above are buy-paths. The three tiers below describe how we deploy on the floor: SLA bands, power envelopes, and cooling combinations. Pick a plan above; we map it to the right operating tier at proposal stage.

Three hosting tiers

Air-cooled, hydro and immersion combined, and CAPEX/OPEX large-scale. SLA is per-tier — we don’t average across the fleet to inflate the number.

Tier 01 97% SLA

Air

Power
50–500 kW
Cooling
Air
Best for
Individual & Retail
Density
Standard

Air-cooled facility for individual operators and retail buyers. Single-rig setups, pilot deployments, sites that need predictable operating cost.

Tier 02 98% SLA

Hydro & Immersion

Power
500 kW – 1 MW
Cooling
Hydro + Single-phase & Dual-phase Immersion
Best for
Corporate Enterprises, Resellers
Density
High

Operators prioritizing density and hardware life. Hydro for current-gen Hyd SKUs, single-phase or dual-phase immersion for retrofit fleets and immersion-native SKUs.

Tier 03 98% SLA

CAPEX & OPEX Large Scale

Power
1–3 MW
Cooling
Mixed
Best for
Institutions & Family Offices
Density
High

Institutional fleets, mining funds, family-office allocations. Optimized electrical distribution + dedicated operations coordination.

What operators ask before signing

What hosting tiers does Miners Hub offer?
Three tiers spanning 50 kW to 3 MW: Air (Tier 01, 97% SLA), Hydro & Immersion (Tier 02, 98% SLA), and CAPEX & OPEX Large Scale (Tier 03, 98% SLA). Each tier targets a different fleet profile — individual and retail, corporate and reseller, or institutional.
Where are Miners Hub facilities located?
Across the UAE and Oman, with 21 operating farms and 50 MW active power. Up to 4.5 MW available capacity in UAE today.
Does Miners Hub offer immersion cooling for ASIC fleets?
Yes. Both single-phase and dual-phase immersion are available in Tier 02 (Hydro & Immersion, 98% uptime, reduced thermal stress on hashboards). Suitable for factory-immersion SKUs and aftermarket retrofits — fluid grade and tank class are spec’d at proposal stage.
How long does it take to deploy a new fleet?
Air cooling fleets deploy within 10 days of greenlight (rack space ready, power provisioned). Hydro and immersion fleets take 4–12 weeks because the cooling system is built per fleet — manifolds, tanks, dielectric fluid loops are custom-spec’d to the SKU mix and density. Discovery and design add 4–8 weeks before contract.
What is the all-in cost structure?
All-in $/kWh including transformers, security, monitoring, and repair float. Pricing is tier-specific and disclosed during proposal — not published publicly because it depends on fleet generation, deployment timeline, and contract length.
Discovery is free. Bring fleet size, target $/kWh, current hosting situation, and timeline — we’ll tell you whether MH is the right fit before any contract.

Related services

Request a hosting proposal   WhatsApp operations

Crypto Mining Hosting in the UAE

Crypto mining hosting in the UAE provides fully managed, legal data-centre environments for ASIC miners across Dubai, Abu Dhabi, and Umm Al Quwain. MinersHub operates 50 MW of active mining capacity across 21 facilities in the UAE and Oman, hosting from $0.067 per kWh all-in across three cooling tiers (air, hydro, and immersion).

UAE crypto mining hosting is licensed under VARA (Virtual Assets Regulatory Authority) for Dubai mainland and the ADGM framework for Abu Dhabi. MinersHub operates as Miners Hub Cloud Computing LLC — a Dubai-mainland-licensed entity — and clears ASIC customs imports under our registered broker code from a single regulated entity.

The MinersHub crypto mining hosting service covers Bitcoin SHA-256 ASICs (Antminer S21+ Hyd, S21 Pro, WhatsMiner M60S/M66S) and altcoin ASICs (Antminer L9 + L7 for Scrypt, IceRiver KS5L for Kaspa, Goldshell, Elphapex DG1+). Every fleet ships with 24/7 monitoring, on-site repair via our Al Ain hardware bench, and 1-5 day repair turnaround.

Crypto mining hosting locations across the UAE

  • Dubai — headquarters at Office 127, Schon Business Park, Dubai Investments Park 1. Primary UAE intake site for ASIC customs clearance and fleet commissioning.
  • Abu Dhabi — emirate-level hosting with on-soil ASIC repair routed through Al Ain. ADDC industrial tariff schedule.
  • Umm Al Quwain and other northern emirates — capacity is available through the MinersHub UAE network for fleet-scale clients on request.
  • Oman — Muscat, Sohar, Duqm, and Salalah hosting under the same $0.067/kWh anchor and 98% SLA, with weekly cross-border repair shuttle to Al Ain.

Crypto mining hosting in the UAE — frequently asked questions

What is crypto mining hosting in the UAE?

Crypto mining hosting in the UAE is the colocation of ASIC mining hardware in licensed UAE data-centre facilities. The hosting provider supplies industrial power, cooling (air, hydro, or immersion), 24/7 monitoring, on-site maintenance, ASIC repair, customs import handling, and physical security. MinersHub provides crypto mining hosting in the UAE from $0.067 per kWh all-in across 21 facilities.

Where is crypto mining hosting available in the UAE?

MinersHub crypto mining hosting is available across the UAE — primarily in Dubai (Schon Business Park and DIP intake), Abu Dhabi (with Al Ain on-soil ASIC repair), and on request through the broader MinersHub network in Umm Al Quwain and the other northern emirates. Oman hosting sites in Muscat, Sohar, Duqm, and Salalah operate on the same SLA and pricing.

How much does crypto mining hosting cost in the UAE?

Crypto mining hosting at MinersHub starts at $0.067 per kWh all-in (transformers, security, monitoring, repair float, and customs handling included). The rate scales down with deployment size across three tiers spanning 50 kW to 3 MW. Setup ranges from $50 per miner (air) to $600 per slot (hydro and immersion).

Is crypto mining hosting legal in the UAE?

Yes. Crypto mining hosting is operated legally in the UAE under VARA (Virtual Assets Regulatory Authority) for Dubai mainland and the ADGM regulatory framework for Abu Dhabi. MinersHub operates as Miners Hub Cloud Computing LLC, a Dubai-licensed entity, and handles ASIC import customs clearance under our registered broker code.

What does crypto mining hosting in the UAE include?

MinersHub crypto mining hosting includes industrial power at $0.067/kWh all-in, choice of air / hydro / immersion cooling, 24/7 monitoring of hashrate and temperatures, on-site repair via the MinersHub hardware bench (1-5 day turnaround), customs clearance, and 24/7 physical security. Up to 98% uptime SLA on Tier 02 and Tier 03 hosting plans.

21 FARMS · 50 MW · SUB-10 J/TH

Talk to operations.

30-minute discovery, no contract. Bring fleet size, target hashrate, timeline.